Tail Feathers
03/01/97
Glueing the tailpost in (12K)
After last two verticals, I added ply web for the elevator spar.(12K)
Elevator glued in place - Vertical stab under construction (17K)
Added 9/6/98 after antenna installed in vert stab
co-ax embedded in foam on new vertical stabilizer (22k)
similar but shows new contour/lines for top (25k)
Photos of nearly finished tailcone added 08/17/00
Side view of tailcone showing fit/fairing into tailfeathers
and fuselage (42K)
Shot showing front of turtledeck with fabric bulkhead (36k)
Picture with the tailcone loose - halfoff (29K)