Front Deck/Header Tank building photos

03/01/97


Planks in place with 5 min epoxy (38K)
another view of planking stage (20K)
After 2 layups not trimmed yet (29K)
Front and back walls floxed in and drying (55K)
Side walls installed, before I cut it narrower (32K)
Turtledeck photos posted 4/14/98
TurtleDeck in sanding stage left side from rear (24k)
Front left still sanding (25K)
Right Rear (24k)
After some filling and sanding (30k)
photos added 7/19/00 Building Removable tailcone.
Tailcone after initial layup (41k)
After cutting thru the hot glue (29k)
Another view of it removed. (39k)
Front view (39k)
Canopy/canopy frame added 5/4
Dragonfly canopy test fit (28k)
View of frame fit on turtledeck (26k)
Homebuilt canopy frame (31k)
Shot of jig I built to hold frame while floxing in plexi (48k)
Floxed in and hinges built/mounted (26k)
From right side behind stubwing (39k)
Photos of canopy/deck on saw-horses added 9/06
From left - doing layup underneath for gapseal(49k)