Fuselage Building

03/01/97

This is how is starts out (15K)
Glue and Clamping with wax paper (16K)
Skin stapled on with string (14K)
Upside down. Doing the bending (15K)
Clamping the tailpost (12K)
The boat on the cradle I built with center spars slid in (13K)
This is really fun flipping fuselage!! (27K)
New Pictures as of 9/8/97
This is my project on 9/8/97 (58K)
Engine on fuselage 9/8/97 (58K)
This shows left stub with fuel level probe installation (58K)
Pictures of New Canopy frame 9/17/97
DragonFly canopy frame sitting on fuselage(37K)